Things are coming along very nicely in my bathroom remodeling project. The whole thing started out with me re-caulking the tub and has resulted in me replacing the outside of my house and completely remodeling the bathroom. Long story. Anyway, I picked up the last of the hardware this weekend and we've picked tile and paint colors. Here's a rundown of what's occurred in the bathroom:
I'm currently in the process of running new plumbing from the old tub/shower supply lines to the new shower hardware and a separate Roman tub faucet. I've decided I like plumbing quite a bit. I've always wanted an excuse to play with a blowtorch.
After the plumbing is complete, I've got to run two new circuits to run the pump and heater on the tub. That should be fun as well. The easiest way would probably be to run conduit from the outside breaker box along the outside of the house since it's only about 20 feet. I'd prefer coming off of the inside box, but that will be considerably harder. I'm still evaluating the pros and cons of each approach.
Anyway, this is what has been consuming my free time lately.
Remember Me
Page rendered at Tuesday, October 14, 2008 8:11:51 AM (Pacific Standard Time, UTC-08:00)
Disclaimer The opinions expressed herein are my own personal opinions and do not represent my employer's view in anyway.